Commissioning the facility. GASK certificate (DABI)

The role and importance of the technical passport bti when putting the facility into operation

What is the commissioning of an object?

Сертификация ГАСКToday we will talk about the commissioning of construction projects. In accordance with the legislation of Ukraine, any constructed construction object must have documents, confirming commissioning and compliance with building codes and regulations (DBN). All existing stages of construction are associated with the registration and approval of a set of various legal documents.

The final stage of construction is, of course, commissioning, preceding this stage is filling out the declaration of readiness of the construction object. The declaration of readiness is completed by the Customer. All technical characteristics of the construction object are entered into the declaration of readiness: built-up area, useful and auxiliary area, height, wall materials, foundations, etc..

All data, which are entered in the declaration are taken from new technical passport bti, which is made immediately after completion of construction work. They can be commissioned as objects of new construction, and reconstruction objects, restoration, overhaul of buildings and structures of civil, public and industrial purposes. For all of the above objects, a technical passport bti is also produced. The basis for filling out a declaration on the readiness of a construction object is a technical passport bti with technical indicators and characteristics of the construction object.

The law provides for two types of documents, confirming the readiness of the facility for operation:

– declaration of readiness of the construction object - for small buildings and category CC1 (individual residential houses, garden and country houses, household buildings and structures) are commissioned on the basis of a registered commissioning declaration;

– commissioning certificate – for objects of categories CC2 and CC3.

(apartment building, non-residential building, business centers, shopping centers, refueling, the shops)

Expert BTI Shandrik O.I. will visit your facility, will make all the necessary measurements, in the shortest possible time will prepare a technical passport of the BTI for further filling out the declaration of readiness of the construction object.

Why do you need to commission construction objects?

Ввод объекта в эксплуатациюThe commissioning of the construction object is already the last, final stage, which allows you to obtain ownership, and also makes it possible to connect to engineering networks (after commissioning, you can officially conclude contracts and connect the light, water, gas), which will enable the construction object to fully function.

Expert BTI Shandryk O.I. will give advice on all the necessary documents for drawing up a declaration of readiness, at the request of the Customer will provide a range of services: assistance in filling out a declaration of readiness, representation of the interests of the Customer in state bodies, will prepare a new technical data sheet bti, we will help you to commission your construction project.

Get a free consultation

Just leave your contact details and we will contact you

If you have questions or you have no time to deal with all the necessary documentation, please contact Expert BTI O. Shandryk. We will help you to correctly draw up all the necessary documents as soon as possible with a minimum package of documents with a minimum waste of time and your efforts.